FeCrAl(0Cr23Al5) Resistance Heating Wire
FeCrAl (0Cr23Al5) Resistance Heating Wire is supplied by Heanjia Super-metals Co., Ltd..
The
FeCrAl (0Cr23Al5) Resistance Heating Wire is a ferritic iron-chromium-aluminium alloy (FeCrAl alloy) which is used at temperatures up to 1250°C. It is used in fast response elements for ceramic glass top hobs and quartz tube heaters.
FeCrAl (0Cr23Al5) Resistance Heating Wire is widely used in household lectrical appliance, heating elements, mechanical manufacturing and other industrial fields.
Our FeCrAl alloy wire and strip have outstanding thermal stability and mechanical properties by applying the following techniques:
1. Applying the double electro slag refining technique and special control inclusion technique.
2. Adding rare earth element: increase the FeCrAl alloy's whole properties, such as max working temperature and continuous working life.
The FeCrAl alloy wire and strip received favorable comments from Japan, US and Europe market.
Chemical Composition (%) and Properties
H23YU5 0Cr23Al5 |
Main Chemical Composition | Cr | 20.5-23.5 |
Al | 4.2-5.3 |
Fe | Rest |
Mn | ≤0.7 |
Max Continuous Service Temp.of Element °C | 1250 |
Density g/cm³ | 7.25 |
Resistivity Ω m²/m | 1.35±0.06 |
Temp.Coefficient of Resistance | 14.5 |
Melting point | °C | 1500 |
Tensile strength | Mpa | 637-784 |
Elongation % | | >12 |
Variation of area | % | 65-75 |
Bending frequency | | >5 |
Hardness | 200-260 |
Micrographic Structure | F |
Magnetic Property | | Magnetic |
Wire Specification
Wire | CNS 2962-1984 | Diameter:0.05mm-10.0mm, 0.002 Inch to 0.3937 Inch |
Product Description: The product produced by us is of good quality and is priced reasonably.
Competitive price: The labour cost and cost on procuring the raw materials is low and hence the manufacturing cost is reasonable. We provide high facility in short producing cycle and have strong adaptive capacity in producing variation of products.
High quality assured: The work done by us has a good command of advanced technological process in the respect of smelting, rolling, drawing and heat treatment up to finished products. The chemical analysis department, the physical testing department and the quality control department all operate an all-round monitoring of our products from raw materials to final products.
Packing Process & Transportation:
Packaging: Seal up, with plastic inside and wooden case or carton outside; or according to the customer's requirements.
Transportation: By air: Beijing International Airport OR By sea: Trianjin Seaport
We provide our customers with excellent services. If you want more detailed information of this product or related problems, please contact with us, we will reply as soon as possible (general in 24 hours).
Other Terms
Minimum Order Quantity | Manufacture Period | Payment Terms |
50 KG | 10-15 Days (Small Quantity) | 20-40 Days (Mass Quantity) | L/C, T/T, Western Union |